Now the summer holiday has started, I've made a start on renovating the bathroom on the top floor. The plan is to replace the existing toilet and washbasin, remove the old wall and extend the room so I can build a shower in the room and make it into a complete 2nd bathroom.
08 August 2014
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment